Buyer guides · Updated 2026-10-30

Received a party wall notice? Consent, dissent or your own surveyor — a calm guide for neighbours

Received a party wall notice? Learn your 14 days, consent vs dissent, why you don't pay your surveyor's reasonable fees, and what to check before signing.

A party wall notice doesn't mean you're in trouble. It means your neighbour is following the law. You have 14 days to reply in writing, and you have three options: consent, consent with a condition survey, or "dissent" and appoint a surveyor, whose reasonable fees are normally paid by your neighbour, not by you. Dissent doesn't block the works. It simply puts the details in the hands of a surveyor.

Key takeaways

  • Receiving a notice is a good sign: your neighbour is using the process the Party Wall etc. Act 1996 sets out.
  • You have 14 days to respond. If you don't reply, a dispute is treated as having arisen, and a surveyor will be involved anyway.
  • "Dissent" is not an objection. It means "I want a surveyor to agree the details", and it can't stop lawful works.
  • The building owner (your neighbour) generally pays the reasonable surveyor fees on both sides.
  • Even if you consent, you keep your right to have damage put right. Ask for a condition survey before work starts.

What is a party wall notice, and why did I get one?

The Party Wall etc. Act 1996 applies in England and Wales. Under it, an owner planning certain works has to tell the neighbour in writing first. Typical examples are cutting into a shared wall to take the bearing of a beam for a loft conversion, underpinning, building a new wall on the boundary, or excavating within 3 or 6 metres of your building below certain depths [1][2]. Your neighbour is the building owner, and you are the adjoining owner.

The notice should describe the works and give a proposed start date. For work to an existing party wall, the notice period is at least two months. For a new wall on the boundary or nearby excavation, it is one month. A notice is valid for one year [2].

Feeling "caught off guard" is normal [3]. You don't need building knowledge: the Act gives you a professional to check the works.

How long do I have to respond to a party wall notice?

You have 14 days from service. If you don't give written consent within 14 days, the Act treats a dispute as having arisen. Section 6(7) uses this wording for excavation notices [4], and RICS describes the same 14-day rule for notices generally [1]. So silence doesn't make the notice go away. It moves things to the surveyor route.

What happens next, in order:

  1. Day 0: the notice is served.
  2. Within 14 days: you consent, consent with a condition survey, or dissent and name your surveyor (or agree to an agreed surveyor).
  3. No reply after 14 days: a dispute is deemed. Your neighbour then asks you to appoint a surveyor. If you refuse or don't appoint one within 10 days of that request, they can appoint one on your behalf (s.10(4)) [5].
  4. The surveyor(s) prepare the award. This document sets out what can be done, how and when, and who pays [6].
  5. Appeal window: you have 14 days from service of the award to appeal it to the county court [5].

Consent, dissent or your own surveyor: which option should I choose?

Option What it means Pros Cons Who pays
Consent You agree in writing that the works can go ahead Fast and friendly. No surveyor costs No formal record of your property's condition. Consent can't be withdrawn later [7] Nothing to pay
Consent + condition survey You consent, on condition that your property's state is recorded first Keeps things friendly and gives you evidence if cracks appear Less formal than an award, so put the terms in writing Agree in writing that your neighbour pays for the survey
Dissent: agreed surveyor One impartial surveyor acts for both of you and makes the award Formal protection, usually the cheapest form of dissent You share the surveyor with your neighbour Normally the building owner [1]
Dissent: your own surveyor You appoint your own surveyor. Theirs and yours agree the award together Someone you chose looks at the drawings and your house Slower, and costs your neighbour more, which can strain relations Normally the building owner, reasonable fees only [1][5]

There's no single right answer. On forums, neighbours are told both "Just dissent and let nature take its course" and that surveys are "a complete waste of money" [8]. Base your choice on the type of work, not on the advice that sounds most confident:

  • Lighter works (a simple boundary wall, minor cutting-in) with a neighbour you trust: consent plus a condition survey can be enough.
  • Heavier works (underpinning, steels into the party wall, excavation deeper than your foundations, a basement, chimney breast removal on your side of the wall): many people prefer a surveyor and a formal award.
  • You're about to sell, the neighbour is a landlord or developer, or you feel pressured: a surveyor gives you a paper trail.

Do I have to pay for my own party wall surveyor?

Normally, no. This is the most common misconception. One neighbour who was about to sell thought they "can't afford their own surveyor". The top replies corrected them: the party doing the work pays [9]. Legally, the surveyors decide in the award who pays the reasonable costs (s.10(13)) [5]. RICS says the building owner generally pays [1].

There are exceptions. If the works are partly a repair needed because of your disrepair, costs can be split. An adjoining owner who acts unreasonably may also bear some costs [1][2]. Choose someone independent of your neighbour's builders and architect [11]. If a firm writes to you unprompted after a planning application, be careful. Posters call these firms "ambulance chasers" [10].

What should I check before signing a party wall consent form?

  • [ ] The notice names the right owners (all freeholders, and leaseholders where relevant) and the right address.
  • [ ] It describes the works clearly and includes drawings. For steels or excavation, check where the beams sit and how deep the foundations go.
  • [ ] The start date respects the notice period. A notice dated 1 April for works starting on 15 April is a red flag [3].
  • [ ] You have a condition survey (photos and written notes of cracks and finishes) agreed before work starts. "I'd need to know so I can check for any damage" [3].
  • [ ] You know who to contact if something goes wrong, and how damage will be dealt with. Ask your surveyor to confirm how compensation works under the Act.
  • [ ] If you consent, you reserve your rights in writing. A forum reply put it this way: "If you consent you need to reserve your rights" [11]. You keep your rights under the Act even after consenting [7].
  • [ ] You've checked whether your home insurance legal cover could help if things go wrong [12].

I'm selling my house: does a party wall notice cause problems?

It can come up during the sale. Forum replies say you would have to make buyers aware of a live party wall notice, and that it's better to have the agreement in place before marketing [9]. A signed award or a documented condition survey is usually easier to explain to a buyer than an open question. Ask your conveyancer how to disclose it.

My neighbour started work without a party wall notice: what can I do?

Stay calm, and start keeping records:

  1. Photograph your side now: cracks, ceilings, the loft and the chimney breast.
  2. Ask in writing whether the works fall under the Act and request a notice. One neighbour asked exactly that after two chimney breasts on the party wall were removed next door [13].
  3. Don't rely on the council. People who asked Building Control were told it was "a civil matter" [14].
  4. Take advice quickly from a party wall surveyor or a solicitor. A court injunction can halt works [2], but posters warn it is "expensive" with a costs risk [14], and opinions differ once work is already done [13].

The Act itself "contains no enforcement procedures for failure to serve a notice" [13]. But as one reply notes, "a lack of PWA does not mean they can damage your house with impunity!" [13]. Whether a retrospective award is valid is debated [3], so get specialist advice.

FAQ

I've received a party wall notice. What do I need to know? You have 14 days to reply in writing. You can consent or dissent, and dissent simply means appointing a surveyor. The works can't be stopped just by dissenting, but the details will be agreed in an award.

Does dissent mean I'm objecting to the extension? No. A forum answer puts it this way: "'Dissent' does not mean you object to the works or can prevent the works" [8]. It triggers the surveyor process.

What happens if I ignore a party wall notice? After 14 days a dispute is deemed [4][1]. If you then don't appoint a surveyor within 10 days of a request, your neighbour can appoint one on your behalf [5].

Can I change my mind after consenting? Written consent can't be withdrawn under the Act, but you don't lose your rights [7]. That's why a condition survey matters.

Who pays if my house is damaged? Generally the building owner. The Act provides for compensation for loss or damage caused by notifiable works (section 7; confirm the details with your surveyor). A condition survey makes it much easier to prove what changed.

Can I choose my own surveyor even if my neighbour suggests theirs? Yes. You can appoint a surveyor together or each appoint your own [6].

Next step

Not sure which notice you've received? Try our free notice checker. If you want a surveyor, compare providers covering Camden, Islington, Hackney, Wandsworth and Kensington & Chelsea and request quotes through our enquiry form. We're an independent directory and can't guarantee a match.

Related reading: Party wall surveyor fees in London · Do I need a party wall agreement for a loft or rear extension? · The party wall award explained

This is not legal advice. This guide gives general information about the Party Wall etc. Act 1996 in England and Wales. Every situation is different. Consult a qualified party wall surveyor or a solicitor before deciding, and act quickly, because the deadlines (14 days, 10 days, 14 days to appeal) are short.

Sources

  1. RICS – Party walls guide (2020)
  2. ARAG – Party Wall Act explained (law guide, 06/2025)
  3. Mumsnet – Party structure notice just received, what do I need to know
  4. Party Wall etc. Act 1996, section 6 (legislation.gov.uk)
  5. Party Wall etc. Act 1996, section 10 (legislation.gov.uk)
  6. GOV.UK – Party walls and building work: if you cannot agree
  7. Mumsnet Legal – Party wall notice (consent then dissent)
  8. Singletrack World – Party wall act help and Party wall agreements: what's the procedure for the recipient
  9. r/HousingUK – Selling House Party Wall (snapshot, Jan 2026)
  10. Mumsnet – Party wall hell, help
  11. Singletrack World – Party Wall Act 1996, we have been served. What now?
  12. r/HousingUK – Update: Neighbours building extension (snapshot, Jan 2026)
  13. MoneySavingExpert forum – Party wall notice not served
  14. Mumsnet – New neighbour has started a full-width rear extension, no party wall agreement

General information about the Party Wall etc. Act 1996 in England and Wales, not legal advice. Notices, awards and fees depend on your works and your neighbours; confirm with a party wall surveyor or solicitor before you serve notice or start work.