Buyer guides · Published 2026-11-04 · Updated 2026-11-04

RICS Party Wall Guidance 8th Edition: What Changes for Homeowners

The draft 8th edition of RICS party wall guidance, explained for homeowners: where it stands in November 2026, what it targets on fees and the third surveyor, and what stays the same.

As of 4 November 2026, RICS has not published a final 8th edition of its party wall guidance. What exists is a draft 8th edition of Party Wall Legislation and Procedure, which RICS put out to consultation on 8 April 2026. Until a final version is published and takes effect, the 7th edition remains the RICS document surveyors work to. The Party Wall etc. Act 1996 itself is not changing. The draft focuses on how surveyors behave: fee practices, use of the third surveyor, service of notices and updated template letters and awards.

Key takeaways

  • The 8th edition is a draft. We found no final version on the RICS website on 4 November 2026, and no announced effective date.
  • The current RICS document is the 7th edition, effective since 1 December 2019 and reissued as a professional standard in May 2023 [4].
  • RICS says the draft strengthens guidance on fee practices and use of the third surveyor, plus notices, appointment letters and the draft award [1].
  • Your legal rights come from the Act, not from RICS guidance. Who pays, the third surveyor and the 14-day appeal are all set by section 10 [6].
  • For a project starting soon, ask your surveyor which edition they work to and get the fee basis in writing.

Where does the 8th edition stand on 4 November 2026?

RICS (the Royal Institution of Chartered Surveyors) is the professional body that regulates chartered surveyors. Its party wall document tells members how to apply the Act in practice. It does not change the law, but it shapes how most surveyors write appointments, notices and awards.

ItemStatus on 4 November 2026Source
7th edition of Party Wall Legislation and ProcedureCurrent RICS document. Published August 2019 as a guidance note, effective 1 December 2019, reissued May 2023 as a professional standardRICS [4]
Draft 8th editionConsultation launched 8 April 2026, running about eight weeks across April and MayRICS press release [1]
Consultation closing dateReported as 5 June 2026 (RICS's press release gives no exact date)Today's Conveyancer [2]
Final 8th editionNot published on the RICS standards page we checked. To confirm with RICSRICS [4]
Effective dateNot announcedRICS [1][4]
Party Wall etc. Act 1996No change. Legislation.gov.uk lists no outstanding effects for section 10legislation.gov.uk [6]

Trade press also reported that consultation responses would be published in November 2026 [2]. We could not confirm that on the RICS site, so treat it as unconfirmed. Once RICS publishes the final text, check the effective date printed in the document itself. Surveyors appointed before then may still be working under the 7th edition.

What does the draft 8th edition change?

RICS's announcement lists the main areas of revision [1]. Industry coverage repeats the same list [3]:

  • Enhanced appendices, the template documents surveyors adapt.
  • Revised letters of appointment and terms, the paperwork that sets out what you are paying for.
  • An updated draft award, the model for the legal document that settles the dispute.
  • Stronger guidance on conduct, including fee practices, use of the third surveyor, service of notices and public engagement.
  • A restated principle: a party wall surveyor's appointment is personal and statutory, and independent of the client's instructions.
  • A warning on jurisdiction: RICS flags awards that were challenged because surveyors acted without proper jurisdiction, including where there was no genuine dispute between the owners.

The press release gives headings, not detailed rules. We could not access the full draft text, so we cannot tell you exactly what the final wording on fees or the third surveyor will say. Be wary of any article that quotes "new RICS fee rules" as if they were already in force.

Fees: what the draft targets and what applies today

Fees are where homeowners feel the guidance most. The building owner usually pays both surveyors, so the neighbour's surveyor's bill is often the biggest surprise. RICS has said the draft strengthens guidance on fee practices [1], but has not published detail outside the consultation.

What already applies, and will keep applying whatever the 8th edition says:

  • The Act sets the test. Section 10(13) says the reasonable costs of making the award, of reasonable inspections and of other matters arising from the dispute are paid by whichever party the surveyors decide [6].
  • The 7th edition limits what goes into an award. It says awards should only include fees proportionate to the tasks needed to make the award. It adds that the adjoining owner's surveyor's fee is usually a lump sum based on time spent, plus an allowance for inspections [5].
  • Owners can trigger costs too. Under the 7th edition, an owner who causes excessive demands or wasted visits may be exposed to costs [5].
  • Disagreements about fees need not hold up the award. If the surveyors cannot agree an amount, the 7th edition allows the award to go ahead with an interim sum, and the balance goes to the third surveyor [5].
  • You can ask for a breakdown. The government's explanatory booklet says fees are not fixed, and that an owner who thinks costs are unreasonable can ask for the hourly rate and hours charged [7].

In practice, a clearer RICS line on fees should mean better written fee terms at appointment. It will not create a price list. For real-world figures, see our guide to party wall surveyor fees in London. If you think a bill is already too high, read how to dispute party wall surveyor fees under section 10.

The third surveyor: what the Act says and what the draft revisits

When each owner appoints their own surveyor, those two surveyors must select a third surveyor at the outset [6]. The third surveyor does nothing unless called on. Under section 10(11), either owner or either appointed surveyor can ask the third surveyor to decide a disputed matter and make the necessary award [6].

The 7th edition already sets expectations for referrals [5]:

  • Before referring, surveyors should tell the owners what the issues are and what the referral may cost in time and money.
  • Referrals should normally be in writing and define the points in dispute.
  • The third surveyor decides only what is referred and cannot reopen an award already made.
  • The third surveyor's own fees are at their discretion and usually follow the outcome, though conduct can be taken into account.
  • The Act lets the third surveyor serve their award only once the costs of the award have been paid (s.10(15)) [6].

RICS lists "use of the Third Surveyor" as an area of strengthened conduct guidance [1]. It has not said publicly what will change, so be cautious with any firm that presents its own reading as the new rule. Wait for the final edition.

One point matters now: if you and your neighbour use one agreed surveyor, there is no third surveyor to call on [7]. Weigh that when you choose a route. Our agreed surveyor vs two surveyors guide covers the trade-offs.

Jurisdiction and genuine disputes: why it matters to you

Surveyors only gain their powers under the Act when a dispute arises between the building owner and the adjoining owner [6]. If your neighbour consents in writing to your notice, there is usually nothing for surveyors to settle. RICS's draft highlights awards that were challenged because surveyors acted without jurisdiction [1].

For homeowners, the practical points are simple:

  • A valid notice is the starting point. A defective notice can undermine everything that follows, including the award and the fees it allocates.
  • An award made where the surveyors had no jurisdiction may be challenged. The 7th edition notes that a party can argue an award is invalid on that ground [5].
  • Once appointed, a surveyor acts under the Act and owes duties to both owners. You cannot simply sack your surveyor or direct their decisions [5][7].

What does not change

RuleWhere it comes from
Surveyors decide who pays the reasonable costs of the awardAct, s.10(13) [6]
The building owner usually pays when the work is for their benefit; costs can be split where work is needed because of a defectGOV.UK booklet [7]
Either owner can call on the third surveyorAct, s.10(11) [6]
An award can be appealed to the county court within 14 days, beginning with the day it is servedAct, s.10(17) [6]; GOV.UK [8]
You cannot act as your own surveyorGOV.UK [8]

Homeowner checklist for projects starting in late 2026 or 2027

  1. Ask which edition applies. Ask your surveyor whether they are working to the 7th edition or, once published and in force, the 8th.
  2. Get the fee basis in writing before appointment: hourly rate or fixed fee, expected hours, inspections, disbursements and VAT.
  3. Read the letter of appointment and terms. The draft revises these templates, so the wording you are shown may change during 2027.
  4. Check your notice before serving it. Use our notice screening tool as a first step, then have a surveyor review it.
  5. Decide on agreed surveyor vs two surveyors knowing that only the two-surveyor route has a third surveyor.
  6. Diarise the 14-day appeal window for the day the award is served on you.

FAQ

Is the RICS party wall 8th edition in force?
Not as at 4 November 2026. It was a consultation draft launched in April 2026, and we found no final version or effective date on the RICS website [1][4]. Check RICS for updates.

Does the 8th edition change the Party Wall Act?
No. RICS guidance explains how surveyors should apply the Act. Only Parliament can amend the Party Wall etc. Act 1996 [6].

Will the new guidance cap party wall surveyor fees?
Nothing published by RICS suggests a fee cap or tariff. The draft strengthens guidance on fee practices [1]. The legal test remains "reasonable costs" decided by the surveyors under s.10(13) [6].

Do homeowners have to follow RICS guidance?
No. It binds RICS members, not owners. In the 7th edition, "must" marks a mandatory requirement for members and "should" marks recommended good practice [5]. Not every party wall surveyor is RICS-regulated, so ask.

What changes for the third surveyor?
RICS has flagged use of the third surveyor for strengthened conduct guidance but has not published the detail [1]. The legal role in s.10(11) is unchanged [6].

My surveyor was appointed before the 8th edition. Does it apply to me?
That depends on the effective date and any transitional wording in the final document, neither of which has been announced. Ask your surveyor and check the final RICS text.

Compare quotes before you serve the notice

Use our free notice checker to see which notice may apply. Then compare providers and request quotes from party wall surveyors covering Camden, Islington, Hackney, Wandsworth and Kensington & Chelsea through our enquiry form. We are an independent directory and cannot guarantee a match.

Related reading: Disputing party wall surveyor fees under section 10 · Party wall surveyor fees in London · Agreed surveyor vs two surveyors

This is not legal advice. This article summarises public information about RICS guidance and the Party Wall etc. Act 1996 in England and Wales as at 4 November 2026. The 8th edition was still a draft on that date. Check the current RICS text and take advice from a qualified party wall surveyor or solicitor on your own situation.

Sources

  1. RICS – RICS launches consultation on updated party wall practice guidance (8 April 2026)
  2. Today's Conveyancer – RICS launches consultation on updated party wall practice guidance (April 2026)
  3. Property Industry Eye – RICS launches consultation (April 2026)
  4. RICS – Party Wall Legislation and Procedure (standards page, checked 4 November 2026)
  5. RICS – Party Wall Legislation and Procedure, 7th edition (PDF)
  6. Party Wall etc. Act 1996, section 10 (legislation.gov.uk)
  7. GOV.UK – The Party Wall etc. Act 1996: explanatory booklet
  8. GOV.UK – Party walls and building work: if you cannot agree

General information about the Party Wall etc. Act 1996 in England and Wales, not legal advice. Notices, awards and fees depend on your works and your neighbours; confirm with a party wall surveyor or solicitor before you serve notice or start work.